Jump to content
mit12345

SDWAN Lab in GNS3

Recommended Posts

You need to install the enterprise ca cert on all components (vedge,vsmart,vbond,vmanage,cdege). You can sync the serial file directly from your smart account or upload to vmanage)

  • Like 1

Share this post


Link to post
Share on other sites
On 4/13/2020 at 1:50 AM, johnsnow007 said:

CPU

    Intel(R) Core(TM) i7-8850H CPU @ 2.60GHz    Base speed:    2.59 GHz
    Sockets:    1
    Cores:    6
    Logical processors:    12
    Virtualization:    Enabled
  

 

EVE is running in workstation with 22gb of memory and 4 Processors. I assigned 8gb to vmanage , 2gb vbond, 2gb, vsmart, and 2gb vedges all version 18.4.4

How many vCPU for each of them ?

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


×
×
  • Create New...